top of page

April 16, 2011

Phase one works on the Battleship Building have reached practical completion, with the installation of the engineered oak floor in the main Reception and Exhibition space. The new space occupying 1,000m2 of the Grade 2 listed Battleship Building provides open plan seating, meeting space, and social space for up to 90 employees of BDSP Partnership. All carpets are 70% recycled content, all timber joinery is FSC certified, entrance matting is made of recycled car tyres, and a series of full height electro-chromatic glazed panels were salvaged from another site in London



Architectural Association Technical Studies,TS2

The series of eight lectures titled ‘Environmental Design in Practice’ given as an optional Technical Studies course to 2nd year students concluded for the year. The course aimed to provide students with an intuitive grasp of the underlying principles of environmental design, and the creative opportunities these present in terms of architectural form, materiality, and expression. A key aim of the course was to enthuse and inspire students that environmental concerns can be a generating, rather than a limiting factor in architectural design. Prospectus can be read here. Feed-back from the students was very positive.

bottom of page