We have reached that auspicious moment where our brickwork is now the same height as the hoarding…. Things should start moving quite quickly now….

We have reached that auspicious moment where our brickwork is now the same height as the hoarding…. Things should start moving quite quickly now….

Zinc portal frames around a ground floor and dormer windows are designed to provide the necessary solar control to the windows. The house has been completely reconfigured and extended, the new interventions linked with a palette of materials comprising solid oak panels, pigmento red zinc and external sandstone tiling. A new kitchen bench seating area addresses the garden through the glazed corner window. More photos to follow…..

New rendering of our Thames House project, due to go out to tender this month. The glazed corner windows catch oblique glimpses toward the Thames, and sit flush with a fibre-cement cladding. The volume of the main house is lifted up over a brick base, constructed of the recycled bricks from the existing house which will be demolished. Rendering by Whitaker Studio.

A-Zero Architects - Copyright © 2026