top of page

Top
Anchor 1
Project
On-site
TEAM
Architects: A-Zero Architects
Giles Bruce, Mizue Katayama, Ingrid Hu
Structural Design:
Timberframe
Contractor:
Wanstead Pasivhaus
London, UK,
We are on site with a timber-framed passivhaus at the moment. The project has been designed around a prefabircated trimber frame system, which has allowed for a very stream-lined construction process, with minimal waste, and a high degree of precision.
Construction is due to complete at the end of 2025.


Similar projects
Environment
Context
A-Zero Architects - Copyright © 2025
bottom of page







