top of page
A0 Logo Hi Res for Website centred.png

Quarry House Envelope Install

  • Giles Bruce
  • Feb 16, 2020
  • 1 min read

Updated: Sep 29, 2021

The pre-fabricated envelope of our Quarry House was installed this month. The twin wall panels, fabricated by DG timber solutions, and installed by Construkt CLT went in despite the storm force winds that battered the site…



 
 
 

Commentaires


A-Zero Architects - Copyright  © 2025

 

bottom of page